Traffic will not be rerouted for WinCo. The one-way system for the Downtown Loop project is located between the George Washington Way / Jadwin Ave intersection and Symons Street. A separate project at the George Washington Way and Columbia Point Drive signal is planned to begin in September 2025 to add an additional southbound lane on GWW and an additional left turn lane from Columbia Point Drive to the SR-240/I-182 interchange.



